Size & Layout
   
The building is 7,244 sq.ft.
Divided into front office or retail space, central gallery or studio, and back workshop, plus garage
 
Main Floor: 6,340 sq.ft.
Front offices/showrooms; full bath; full kitchen, all with 8'+ ceiling height
Central gallery, back workshop, vehicle bay w/lift, all w/13'+ high ceilings
Handicap accessible half bath; break area
All heated & cooled w/new duct work and heat pumps
Garage: 420 sq.ft.
Auto bay w/lift
Gas heat; no a/c

 
Finished Second Story: 484 sq.ft.
Open storage area, walk in storage room, two half baths, over kitchen and bath below
Heated & cooled w/heat pumps
(Plus additional loft storage over front offices, not included in sq.ft. Gas heat; no a/c.)
 
Exterior Access
3 Single Doors
2 Overhead Doors: 12' wide x 12' high, electrically operated
   
 
Zoning
   
The property is zoned B2 general commercial which allows for a variety of uses
including office, retail, service, and light manufacturing.
It is located in the Enterprise Zone, with tax incentives for renovations and improvements,
and is part of the Staunton Downtown Development Association, which organizes events
and markets this entrepreneurial community.
   
 
Renovations & Upgrades

2007
Major renovations received an award from the City of Staunton and the Industrial Development Authority.
The open space was divided into distinct retail, office, and work spaces, with high ceilings in all work spaces.
Four new restrooms including one handicap accessible and one with shower were installed.
A full kitchen with all major appliances was created for employee use and catered events.
Main floor was fully air conditioned (except for vehicle bay), in two zones, all with new ducts and heat pumps.
New suspended ceiling in workshop areas. New drywall ceiling in kitchen and gallery.
Electrical systems (110 and 220, three-phase) and lighting fixtures were upgraded throughout the building.
Phone, security and internet/wifi systems were installed.
New window frames and glass/plexiglass were installed in all workshop windows.
Custom woodtone blinds were installed in all storefront windows; metal blinds installed in workshop windows.

2010
Exterior of building was painted.

2016
New heat pump for front offices was installed.

2017
New roof was installed.
 
2020
Wood and vinyl flooring was installed in office, gallery, and kitchen areas.
New exterior doors: two steel overhead doors and two steel single doors were installed.
First of two new heat pumps was installed for workshop & gallery areas.
 
2022
Second new heat pump was installed for workshop & gallery areas.
 
   

   